Top performance for the future!

Four strong partners from the agricultural sector have collaborated to develop an extremely efficient, high-performance grain terminal with extensive storage and handling capacities at the seaport in Rostock. This state-of-the-art grain collection and silo facility forms the foundation for an excellent future.

For example, at berth 18, a Panmax ship with a loading capacity of 65,000t can be loaded within three days.

For the “Neubau Bahnannahme am Getreidehafen in Rostock” construction project we intend to make restricted calls for tenders for the following areas:

–       excavation work
–       roof and façade work
–       structural steel work

The construction project is scheduled for 2019. Further information on these areas of the construction project can be found in the PDFs by clicking on the respective link (German only).

Facts & figures

0 m
depth at berth 18
0 t/h
ship loading performance
0 ha
total area
0 t
storage capacity
0 %
modern weighing and sampling via online information terminal
0 h
receipt of goods service depending on the season (12-24h)
0 t/h
receiving capacity for unloading of trucks
0 t/h
receiving capacity for unloading of block trains